Saturday, May 28, 2011
Week ending May 27th
This week has seen Alfie_Ricardo complete the access hatch detail, which conformed to the existing ceiling grid. It was great to have some original design input in something that had not been done for the hospital. Adding to this, I was commisioned the task of adding a ceiling walkway in an Operating Theatre void space where there was equipment to be stored so I had to put the walk way in which would cater for the accessing person. So it was great to also do another mini-design exercise.
Friday, May 13, 2011
Week ending May 13th
The final week of the draughting for the Noah Property. This week saw the end of all the require drawings for the Property and Condition Survey for the house in Observatory, as well as fire evacuation plans and possible design changes to the house.
Friday, May 6, 2011
Week ending May 6th
Hey hey people, I hope who reads this is in great spirits. The week has been a little hectic with trying to finish up drawings for the survey and trying to beat deadlines. I've been continuing with the NOAH house. We checked the areas of the rooms I had drawn up and discoverd that the rooms didn't meet the minimum requirements for the required room sizes so we started redesigning the entire house in order to try and achieve the required areas which was quite nice. Well, thats all from me. Health and joy to you all.
Later days.
Later days.